batch delta
b-union-1
What it merged
16/5/0 stage1; 4 corrected, 1 dropped (n16 one-off node); stage2: 2 hedge demotions; merged 20 edges, 3 new nodes
What the graph carries from it
This batch declares no paragraph window. The windowed pipeline came later, so the records it merged cannot be identified from the graph without guessing, and nothing is derived here. Its commits are below.
Commits
| commit | date | subject |
|---|---|---|
| 4ea8678 | 2026-07-27 | pipeline: b-union-1 stage-1 gated (16/5/0), stage 2 held for credit window |
| bb5d4d2 | 2026-07-27 | b-union-1 merged (20 edges, 3 nodes, v2 two-stage gate); About panel claim-coverage framing + dispute note; ledger sync |
Every claim this batch merged is on the ledger with the gates it passed; this page is the batch-level record around them. Releases that shipped it link here from the release notes.